Our latest installation project: reconstruction the old ground of an electronic workshop into PVC conductive tiles.
Here are 7 steps we should do and the installation pictures as reference.
Step 1:
Material XYD-302 PVC conductive tiles (our popular colors xyd-601, xyd-602, xyd-611, more details, please learn at: https://xueyanfloor.com/portfolio/esd-tiles/

Step 2:
Clean the ground and make sure there is no dust.

Step 3:
Applying Conductive Adhesive. Use a serrated brush to apply a layer evenly on the ground.

Step 4:
Laying copper strip and vinyl tiles. Form a grid.

Step 5:
Opening V-shaped Groove & laying welding rod.

Step 6:
Test the electronic resistance. Then check the result if it is qualified.

Step 7:
Clean the floor and apply wax protection if it is necessary.

About the installation details, please learn more at website:
https://xueyanfloor.com/esd-flooring-installation/
Or more help, please feel free to contact us.


